Blog number four from Mike
This week we put in place a cable drop needed for the last power point on the ring. We checked the quantities of items needed to install the ring main cables into the walls in the training room. The two cellars are to be wired in conduit on the surface. The clearing out of both cellars is required.
I visited Wicks and ToolStation and found that Wicks have more of what we require.
We are also starting to think about the switching of the lights in the entrance corridor to the training room, what is shown on our drawing does not seem to be the best option.
Basement very cold and damp despite the sun shinning on the tarp covering the skylight.
Add new comment